Gucheng and Babaoshan on Line 1 closed temporarily in February 2026 during branch construction. On 16 May, Pingguoyuan, Gucheng and Babaoshan resumed service. The rebuilt underground concourse at Pingguoyuan links Lines 1, 6 and S1.

Does the old footbridge still serve Wangjingxi transfers?

Line 17 and the transport hub opened at Wangjingxi on 31 January. The old transfer bridge between Lines 13 and 15 closed at that point. The replacement route passes through the Line 17 concourse; follow the interchange signs inside the station.

Related lines · Line 1 · Line 17 · Plan a journey from your station

The three reopened stations on Beijing Line 1
MetroMan illustration

MetroMan announcements · 2026-01-29 · 2026-02-09 · 2026-05-15