The first section of Line 12 opened on 1 May 2026. The second section completed the loop on 29 October, bringing it to 37 underground stations. At launch, a circuit took about 96 minutes.

Which transfers require leaving the station?

The opening arrangements required an out-of-station transfer from Hankou Station North Square to Line 2 at Hankou Railway Station. At Wuchang Station East Square, Line 11 was an internal transfer, while Lines 4 and 7 at Wuchang Railway Station required going outside. The Yangluo Line also extended between Zhongyi Road and Houhu Avenue on 29 October.

Related lines · Line 12 · Yangluo Line · Plan a journey from your station

The completed Wuhan Line 12 loop
MetroMan illustration

MetroMan announcements · 2026-04-30 · 2026-10-29