Daguanying 达官营

Line 7 Line 16

Exits

Exit B

Guanganmenwaida Street (广安门外大街) 、 Shoupakou North Street (手帕口北街) 、 Beijing Shidishisi (市第十四) Middle school Gao (高) middle 、Guanghuaxuanxiaoqu (广华轩小区)、Zhongguoguojiahuajuyuan (中国国家话剧院)

Exit C

Hongju East Street (红居东街) 、 Honglian Road (红莲路) 、 Shoupakou South Street (手帕口南街) 、 Beijing Zhongdinglvshishiwusuo (中定律师事务所)

Exit D

Guanganmenwaida Street (广安门外大街) 、 Honglian Road (红莲路) 、Sanyili (三义里)、 Maliandao South Street (马连道南街)

Exit E

Lianhuahe Road (莲花河路) east side 、 Beijing Primary school Hongshan (红山) School 、Lianhuahechengshixiuxian (莲花河城市休闲) Park

Exit F

Guanganmenwaida Street (广安门外大街) north side 、Zhongguoguojiahuajuyuan (中国国家话剧院)

Toilets

(Line 7) platform towards Universal Resort, front of train platform towards Wanpingcheng, front of train

  • Toilets

(Line 7) platform towards Universal Resort, front of train platform towards Wanpingcheng, front of train

  • Accessible toilet

platform towards Wanpingcheng, front of train side

  • Line 16
  • Accessible toilet

platform towards Wanpingcheng, front of train side

  • Line 16
  • Toilets

Station facilities

Baby care room

(Line 7) platform towards Universal Resort, front of train

Entrance lift

(Line 7) Exit B (Line 7) Exit C Exit E

Station lift

(Line 7) Available Available

Stair-climbing wheelchair aid

(Line 7) east Office area Mechanical and ventilation plant room

AED

(Line 7) Concourse East concourse, near Station control room (Outside ticket gates) Platform towards Bei'anhe Door 25

Entrance ramp

(Line 7) Exit B Ramp (Line 7) Exit C Ramp Exit E Ramp

Lift

Platform to Concourse (Platform / Concourse Middle South part)、 External concourse To the external Transfer Hall (External concourse South part)、 Concourse to Street level (Exit E)

  • Line 16

Ramp

Exit E Lift Street level Floor

  • Line 16

AED

Middle of platform

  • Line 16

Storage lockers

Middle of the concourse (Escalator side wall)

  • Line 16