Shuangjing 双井

Line 7 Line 10

Exits

Exit A

Dongsanhuan Middle Road (东三环中路) 、 Guangqumen Wai Dajie (大街)、 Beijing Fuli (富力) Plaza Shopping center 、Hengfeng (恒丰) Bank Beijing Fulicheng (富力城) Branch

Exit B

Guangqu Road (广渠路) 、 Shuangjing Beili (北里)、 Dongsanhuan East Road (东三环东路)

Exit D

Dongsanhuan South Road (东三环南路) 、Chuiyangliubeili (垂杨柳北里)、 Guangqumen Wai Dajie (大街)、 Guomao Shijigongyu (世纪公寓)

Exit E

Dongsanhuan Middle Road (东三环中路) 、Lecheng (乐成) Center

Exit F

Guangqu Road (广渠路)

Exit G

China Post 、Baihuanjiayuan (百环家园)

Exit H

Dongsanhuan Middle Road (东三环中路) (east side)、 Guangqu Road (广渠路) (south side)

Toilets

(Line 7) platform towards Beijingxi Zhan (Beijing West Railway Station), rear of train (Line 10) platform towards Jingsong, front of train

  • Toilets

(Line 7) platform towards Beijingxi Zhan (Beijing West Railway Station), rear of train (Line 10) platform towards Jingsong, front of train

  • Accessible toilet

Station facilities

Baby care room

(Line 7) platform towards Beijingxi Zhan (Beijing West Railway Station), rear of train (Line 10) platform towards Jingsong, front of train

Entrance lift

(Line 7) Exit F (Line 10) Exit C (Not open in the source notice)

Station lift

(Line 7) Concourse to Platform (Towards Universal Resort Door 23 、 Towards Beijingxi Zhan (Beijing West Railway Station) Door 10) (Line 10) platform towards Guomao, rear of train

Platform lift

(Line 7) south Transfer Hall (Line 10) None listed by the operator

Stair-climbing wheelchair aid

(Line 10) None listed by the operator

AED

(Line 7) Middle of the concourse, near Lift (Inside ticket gates) (Line 10) Platform towards Jingsong Door 13 - Door 14 On the facing wall

Entrance ramp

(Line 7) Exit F Lift 、 Ramp (Line 10) Exit A Ramp (Line 10) Exit D Ramp