Chongqing Rail Transit · Chongqing SkyShuttle · Line guide
YOUR JOURNEY AT A GLANCE
In Bishan, use SkyShuttle for the next leg.
Check the route direction and main connections, then plan around your onward transport or destination. These selected stops focus on getting there rather than sightseeing at every station.

Know your line before you travel.
The line runs between Subway Line 1 and Chengyu Railway Station. Check the train destination and onward connection before setting off; the highlights are not a one-day checklist.
Selected stops · intermediate stations omitted
THE CONNECTIONS
Where to board and connect.
Key connections in station order. Check your destination and onward journey before you travel.
2 connections
Subway Line 1 connections
Plan the next transport leg
From Subway Line 1, confirm the destination entrance and plan the onward walk or surface connection. Arrival at the station is not the end of every journey.
Follow station and destination signs, allowing extra time with luggage.
Time planning · Allow time for your onward journey
02Chengyu Railway Station connections
Plan the next transport leg
From Chengyu Railway Station, confirm the destination entrance and plan the onward walk or surface connection. Arrival at the station is not the end of every journey.
Follow station and destination signs, allowing extra time with luggage.
Time planning · Allow time for your onward journey
BEFORE YOU GO
Leave room for connections and luggage.
Check elevation before walking
Outside the station, slopes, stairs and roads at different levels can change the route considerably. Check a suitable entrance when travelling with luggage or a stroller.
Check opening and admission
Venues, gardens and events have their own opening and ticket arrangements. Visit durations are editorial estimates, not opening hours or train times; choose only the stops that interest you.
Photo credits
- 璧山云巴高铁璧山站.jpg — Daredemodaisuki 114514 · CC BY-SA 4.0
Display-frame crop; original files unedited