5

Chongqing Rail Transit · Line 5 · Line guide

32 stations 48.7 km Opened December 28, 2017

YOUR JOURNEY AT A GLANCE

From Yuegangbeilu to Tiaodeng. Plan the onward journey.

Check the route direction and main connections, then plan around your onward transport or destination. These selected stops focus on getting there rather than sightseeing at every station.

Tiaodeng connections, archival view
Tiaodeng connections, archival view

THE CONNECTIONS

Where to board and connect.

Key connections in station order. Check your destination and onward journey before you travel.

2 connections

01Line 5Ranjiaba
Ranjiaba ↗

Ranjiaba connections

Plan the next transport leg

This station serves Line 5 / Line 6 / Loop Line. Check the next line, direction and station signs; allow separately for the interchange walk.

Getting there

Follow station and destination signs, allowing extra time with luggage.

Time planning · Allow time for your onward journey

Tiaodeng connections, archival view02
Tiaodeng ↗

Tiaodeng connections

Plan the next transport leg

This station serves Line 5 / Line 18 / Jiangtiao Line. Check the next line, direction and station signs; allow separately for the interchange walk.

Getting there

Follow station and destination signs, allowing extra time with luggage.

Time planning · Allow time for your onward journey

BEFORE YOU GO

Leave room for connections and luggage.

01

Check elevation before walking

Outside the station, slopes, stairs and roads at different levels can change the route considerably. Check a suitable entrance when travelling with luggage or a stroller.

02

Check opening and admission

Venues, gardens and events have their own opening and ticket arrangements. Visit durations are editorial estimates, not opening hours or train times; choose only the stops that interest you.

View line information ↗
Photo credits

Display-frame crop; original files unedited