5

Shenzhen Metro · Line 5 · Line guide

37 stations 50.3 km Opened June 22, 2011

YOUR JOURNEY AT A GLANCE

From Chiwan to Grand Theater. Plan the onward journey.

Check the route direction and main connections, then plan around your onward transport or destination. These selected stops focus on getting there rather than sightseeing at every station.

Shenzhen North Station connections, archival view
Shenzhen North Station connections, archival view

THE CONNECTIONS

Where to board and connect.

Key connections in station order. Check your destination and onward journey before you travel.

3 connections

01Line 5Qianhaiwan
Qianhaiwan ↗

Qianhaiwan connections

Plan the next transport leg

This station serves Line 1 / Line 5 / Line 11. Check the next line, direction and station signs; allow separately for the interchange walk.

Getting there

Follow station and destination signs, allowing extra time with luggage.

Time planning · Allow time for your onward journey

03Line 5Buji
Buji ↗

Buji connections

Plan the next transport leg

This station serves Line 3 / Line 5 / Line 14. Check the next line, direction and station signs; allow separately for the interchange walk.

Getting there

Follow station and destination signs, allowing extra time with luggage.

Time planning · Allow time for your onward journey

BEFORE YOU GO

Leave room for connections and luggage.

01

Check opening and admission

Venues, gardens and events have their own opening and ticket arrangements. Visit durations are editorial estimates, not opening hours or train times; choose only the stops that interest you.

View line information ↗
Photo credits

Display-frame crop; original files unedited